College Park Baptist Church

WINSTON-SALEM, NC

DETAILS

Over a two-year period we renovated the existing 12,900 sf three-story classroom building one floor at a time.  Each floor was gutted and rebuilt with all new interior walls, ceilings, and updated with new finishes.  After completing the classroom renovation we built a 10,600 sf Gymnasium with a lobby connector that included large restrooms and four-stop elevator.  Gym was pre-engineered metal building with block/brick walls, an exposed steel roof system, and the floor was a Class II Maple athletic floor.

© 2020 by Dry Ink Designs

  • White Facebook Icon